BRE: BIM in Wales Dan Rossiter BIM Team, BRE Wales 26 th of September, 2014 Part of the BRE Trust
Agenda – About me – What is BIM – The Origins of BIM – Egan, Latham, Construction Strategy – BIM Level 2 Requirements – BS 1192, BS 1192 -2 and other documents – BIM in Wales – Welsh Construction Strategy, CLAW Toolkit – How the BRE can help – – – Education Certification Consultancy
About Me
Dan Rossiter ?
What is BIM
What is BIM R N E IO T T E A N B M E R EM O G F A IN N A M BIM (Building Information Modelling) – It’s not just 3 D CAD – It’s not just a new technology application – It’s not next generation, it here and now! BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3 D models and intelligent, structured data attached to them. http: //www. bimtaskgroup. org/bim-faqs/
What is BIM?
The Origins of BIM
The Origins of BIM Latham Report Egan Report 1994 1998 Accelerating Change Never Waste A Good Crisis 2002 2009
The Origins of BIM Quiz Time Based on the last eleven years of KPI’s: What percentage of projects come in on time and no budget? ~50% Wolstenholme, 2009
The Origins of BIM was seen as a way to Cost Improve: Carbon
The Origins of BIM “Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous”
“Information is Uncoordinated…”
“Information is ambiguous… or why we need Standards”
“Information may be incomplete…”
“Information is uncoordinated…”
“Information is also geospatially incorrect…”
The Origins of BIM Construction Strategy 2011 – There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament. – Government will require fully collaborative 3 D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.
The Origins of BIM BIS BIM Strategy 2011 – The Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information.
BIM Level 2 Requirements
BIM Maturity Levels – Strategy Paper 2011 0 - Unmanaged CAD probably 2 D, with paper (or electronic paper) as the most likely data exchange mechanism. 1 - Managed CAD in 2 or 3 D format using BS 1192: 2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration. 2 - Managed 3 D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “p. BIM” (proprietary). The approach may utilise 4 D Programme data and 5 D cost elements. 3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as i. BIM or integrated BIM potentially employing concurrent engineering processes.
UK Standards for BIM BS 1192: 2007 PAS 1192 -2: 2013 PAS 1192 -3: 2014 BS 1192 -4: 2014 BS 8541 Series (COBie)
BIM Industry Documentation PI For BIM Protocol (CIC) Uniclass (CPIC) Digital Plan of Work CPIx Online (BIM Task Group) (CPIC) ? ?
BIM in Wales
BIM in Wales CEWales BIM Task Group Working Paper 2012 Recommendations: – Alignment with UK Government with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department Projects to lead at level 2 by 2015. – A value or threshold for Wales could not be established in the timescales allowed. Collaborative working arrangements and internal business development should still be encouraged until such a value is set. Pilot projects are expected to inform the thresholds based on value and complexity by 2014/15. – The following improvement areas are proposed: i. Added Value ii. Cost Predictability iii. Carbon Intelligence
BIM in Wales Welsh Construction Procurement Strategy 2013 Key Objectives and Milestones: – Alignment with the UK Government Building Information Modelling (BIM) strategy, with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department projects to lead at level 2 by 2015.
BIM in Wales Contains: The CLAW All Wales BIM Toolkit 2014 (Draft) – Introduction – Setting the BIM Scene – Business Case IT Investment – Employer Information Requirements Template – Employer Information Requirements Example – Glossary of Terms – Procurement Guide – BIM and GSL Guide – Collaborative Maturity Assessment Tool – Standards and Protocol Reference
How BRE Can Help www. bre. co. uk/BIM
BIM Level 2 Training Course – BIM Foundation Course (AP) Covering BIM processes, procedures, information models, management and collaboration – BIM Level 2 PAS 1192 -2 Project Information Manager (PIM) Task Information Manager (TIM) – BIM Level 2 PAS 1192 -2 Project Delivery Manager (PDM)
BIM Level 2 Certification Schemes BRE BIM Certificated Professional Schemes – Task Information Manager – Project Delivery Manager BRE BIM Business System Certification Scheme – Audited BIM Capability Assessment
Business Certificate Scheme Benefits – PAS 91 (Working towards UKAS accreditation ) – BRE Certificated – Audited Business Evaluation – Defined Industry Benchmark – Lean Process – Reduced Employers Effort / Cost – Reduced Supply Chain Effort / Cost – Checked by Industry Specialist and Supported by Building. SMART UKI
BIM Checking Service Documentation – Employers Information Requirements (EIRs) – BIM Execution Plans (BEP) Models (BS 1192: 2007. PAS 1192 -2: 2013, BS 1192 -4, BS 8541 Series) – Naming Conventions – Spatial Co-ordination – Model Definition – Volume Strategy – Level of Definitions – Data Segregation – Annotations & symbology
Summary – About me – What is BIM – The Origins of BIM – Egan, Latham, Construction Strategy – BIM Level 2 Requirements – BS 1192, BS 1192 -2 and other documents – BIM in Wales – Welsh Construction Strategy, CLAW Toolkit – How the BRE can help – – – Education Certification Consultancy
Any Questions? Dan Rossiter BIM Consulting / Training Manager Rossiter. D@bre. co. uk
342c0590fd552f35bae5eb72cee4afd1.ppt