ATA - 42 Antenna & Zone Cost Summary Matt Fleming 2008 -03 -14 Part ATA - 42 Antenna & Zone Cost Summary Matt Fleming 2008 -03 -14 Part B of a two part presentation Part A Antenna & Zone Design Summary Part B Antenna & Zone Cost Summary

2 Antenna Elements & 1 Zone Node House 2 Antenna Elements & 1 Zone Node House

Hat Creek Radio Observatory HCRO Hat Creek Radio Observatory HCRO

Included in this discussion ANTENNA • • • Pedestal Alidade & Azimuth Bearing Drives, Included in this discussion ANTENNA • • • Pedestal Alidade & Azimuth Bearing Drives, Motors, Amps Pri Frame, Support Struts Pri & Sec Reflector Surfaces Sec support, Shroud, Radome Limits & Encoders Enclosures & Conduit Electrical & Comm in Antenna ZONE • Foundation • Zone Node • All in Ground Services EXCLUDED • • Antenna Control Computer Feed & Receiver Signal Path Everything Else

More pros • With the pedestal able to project into the area behind the More pros • With the pedestal able to project into the area behind the reflector, the elevation and azimuth axis can be positioned very near the reflector surface. Each axis is close to the center of wind force and these reduced lever arms mean smaller drive loads and should help reduce costs. The elevation axis is close to the center of mass for the tilting assembly which should reduce the need for counterweight.

Cost Projection Based on 42 Antennas Cost Projection Based on 42 Antennas

Antenna Cost Estimated for 350 all tooling and engineering included Antenna Cost Estimated for 350 all tooling and engineering included

Antenna Cost Measured at 42 all engineering & tooling included Antenna Cost Measured at 42 all engineering & tooling included

Engineering Cost per category at 42 Engineering Cost per category at 42

Tooling Cost per Category at 42 Tooling Cost per Category at 42

Material & Labor Cost per Category at 42 Material & Labor Cost per Category at 42

Material & Labor Cost per Category for 350 Material & Labor Cost per Category for 350

Delivery of Primary Reflectors This is our most expensive item. This along with the Delivery of Primary Reflectors This is our most expensive item. This along with the secondary use about 2000 lbs of aluminum. Aluminum costs about 2. 40 $ / lb so our actual material cost is $4, 800. We are paying 17, 000 for the Pri & Sec delivered with stiffeners ready for welding. These items offer the greatest opportunity to reduce labor costs or control profit.

The famous Primary Tool The primary and secondary tool shown here was priced as The famous Primary Tool The primary and secondary tool shown here was priced as follows: $568, 000 Primary tool $75, 000 Secondary tool $68, 000 Other table equipment $46, 000 Tuning tool. The original price base on going full steam ahead into production was $8, 300 for a primary and $571 for a secondary

Extra Costs Building this tool and moving it around in the plant required raising Extra Costs Building this tool and moving it around in the plant required raising the roof and installing a heavy duty bridge crane. Basically we picked up the cost of a lot of this in our tool cost. The 47, 000 lb primary mold tool is shown here After this work and a reduced quantity on the order the price for a complete set of reflectors moved from $8, 871 to $17, 400

Trenching Costs • Trench work Trenching 22, 400 Vault 28, 393 Materials 12, 758 Trenching Costs • Trench work Trenching 22, 400 Vault 28, 393 Materials 12, 758 Boxes 13, 089 Conduit 24, 280 Electrical Equipment 19, 772 Wires 48, 556 Comm 3, 913 Staff Labor 5 p x 30 wks 150, 000 Total Cost for 42 ants 323, 162 meters Complete trench $ / meter 2455 131. 63 A lot of this through rock.

Zone node Cost On Site Assembly Area Zone Node Design 90, 409 Assy tent Zone node Cost On Site Assembly Area Zone Node Design 90, 409 Assy tent 53, 000 Zone nodes 5 ea 143, 227 Assy fixtures 12, 000 Total 233, 636 Transport vehicle 30, 000 Units 5 Price ea with NRE 46, 727 Projected future cost 27, 742

Foundation Costs Foundation Contractor Staff 3 p x 4 wks 175, 519 12, 000 Foundation Costs Foundation Contractor Staff 3 p x 4 wks 175, 519 12, 000 total 187, 519 units 42 Price each 4, 465

2 Foundation Types 2 Foundation Types

Integration • Fully integrated azimuth limit and e-stop board with relays and sensors Integration • Fully integrated azimuth limit and e-stop board with relays and sensors

Lots of Sub Contractors managed by our staff Lots of Sub Contractors managed by our staff

Hat Creek Staff Hat Creek Staff