Assuring Compliance with Waste Acceptance Requirements Federal Office for Radiation Protection Department SE Safety Assuring Compliance with Waste Acceptance Requirements Federal Office for Radiation Protection Department SE Safety of Nuclear Waste Management Section SE 3. 1 Waste Package Quality Control Stefan Steyer Waste Acceptance Criteria for Disposal of Very Low, Low and Intermediate Level Waste 30 September 2010, Peine, Germany 1

Waste Acceptance Requirements and Quality Control Safety Analyses Waste Acceptance Requirements Model Data Quality Waste Acceptance Requirements and Quality Control Safety Analyses Waste Acceptance Requirements Model Data Quality Control 2

Quality Control Measures for Radioactive Waste Packages – Process Qualification with Accompanying Inspections – Quality Control Measures for Radioactive Waste Packages – Process Qualification with Accompanying Inspections – Spot Checking of Legacy Waste – Type Checking of Containers 3

M an u al Process Qualification 4 M an u al Process Qualification 4

Spot Checking of Legacy Waste 0. 5 to 12 % 5 Spot Checking of Legacy Waste 0. 5 to 12 % 5

Process Qualification versus Spot Checking Process Qualification: – Handbook or Spot Checking: – Applicable Process Qualification versus Spot Checking Process Qualification: – Handbook or Spot Checking: – Applicable to Legacy Waste Process Control Quality Plan – Statement on the Suitability of the Process – Checking of 0. 5 to 12 % of the Waste Products – Accompanying Inspections Mandatory according to § 74 Radiation Protection Ordinance 7

Type Testing of Containers – Production of Containers including QA Measures – Prototype Test Type Testing of Containers – Production of Containers including QA Measures – Prototype Test – Assessment of the Application Documents (Construction Drawings, Parts Lists), Results of the Prototype Test and the QA Measures – Supervision of the Container Production 8

Prototype Test • Stacking Test (6 m) -> Stackability • Lifting Test -> Handling Prototype Test • Stacking Test (6 m) -> Stackability • Lifting Test -> Handling • Drop Test 0. 8 m (4 m/s) • Drop Test 5 m • Thermal Test (1 h at 800 °C) 9

Drop Test 5 m 10 Drop Test 5 m 10

Thermal Test (1 h at 800 °C) 11 Thermal Test (1 h at 800 °C) 11