APARTMENT HOUSES CHÝNĚ Author of the slides: Ing. Miroslav Jindrák RD Rýmařov s. r. o. Case study no. 5 Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP 6 – Case Studies PC 3 – A set of case studies
Content of slides l l l l l Apartment houses Chýně The basic version in two designs Profile of the external wall Profile of the ceiling construction The ground plan Technical parameters Building Assembly Increase of fire resistance for bearing external walls Construction time of key delivery
Apartment houses Chýně l Locality construction of 32 timber-based multistoried detached and terrace houses. Turn-key delivery including groundwork, house connections, ground completion and fencing.
The basic version in two designs l l l The houses have two stories with two studio apartments. The basic version is delivered with a saddle roof with a roof inclination of 38. RD 180/38 apartment houses are offered in the basic version in two designs: l - 6 dwelling units: 6 dwelling units 69, 03 m 2 10 dwelling units: 4 dwelling units 35, 15 m 2, 4 dwelling units 37, 50 m 2, 2 dwelling units 69, 03 m 2
Profile of the external wall 1. contact thermo facade 2. gypsum wood-fibre board 15 mm 3. mineral insulation 120 mm 4. gypsum wood-fibre board 12, 5 mm 5. gypsum plasterboard 12, 5 mm 6. frame construction 120 mm
Profile of the ceiling construction 1. anhydrite compound 55 mm 2. Rotaflex 25/20 TSPS 02 3. Mirelon 5 mm 4. particle board 22 mm 5. mineral insulation ORSIL 120 mm 6. Lathing 30 x 60 7. 2 x gypsum plasterboard 12, 5 mm
The ground plan
Technical parameters Ground plan size 16, 96 x 10, 63 m Number of above-ground stories 2 Number of dwelling units 6 (10) Type of roof construction purlin system 38 Construction of external walls framework Thermal resistance for external walls R = 4, 195 m 2 K W-1 Coef. of thermal transmittance for external walls U = 0, 229 W m -2 K-1 External wall fire resistance REI 90, REW 60 External wall airbone sound insulation R w 44 d. B Impact sound insulation for ceiling with covering L´n, w = 52 d. B Airbone sound insulation for flat to flat walls R´ w = 59 d. B
Building Assembly
Increase of fire resistance for bearing external walls REI 60 was required for wall exposed to external heat stress Walls were lined with boards MULTIPOR 600 x 390 x 80 firm product Xella, having increased the external wall fire resistance to REI 90
Increase of fire resistance for bearing external walls
Construction time of key delivery Groundwork: 14 days l Upper timberwork: 67 days -> with a technological interval of 28 days for anhydride maturing l Total costs for construction: 7, 1 mil. CZK l