Aero. Space and Defence Industries Association of Europe ASD SSG monthy conference call on Aero. Space and Defence Industries Association of Europe ASD SSG monthy conference call on the 3 rd of October 2014 Proposed ASD SSG recommendation regarding the governance of international standards initiatives for 3 D PMI “semantic representation” Jean-Yves DELAUNAY: EADS - Airbus 1

Table • Summary of LOTAR Sept. 2014 workshop • Proposed LOTAR recommendations for standards Table • Summary of LOTAR Sept. 2014 workshop • Proposed LOTAR recommendations for standards for 3 D PMI semantic representation • Presentation to the LOTAR project of the status of progress of STEP AP 239 ED 3 whitepaper • STEP AP 242 • Status / planning of CAx recommended practices for STEP AP 242 • Summary of STEP AP 242 ED 2 workshop (draft) • Preparation of AFNet – Pro. STEP i. Vi. P STEP AP 242 benchmark N° 1 Slide 2 ASD SSG monthly confcal - 3 th of Nov. 2014

LOTAR International workshop on the 15 th – 17 th of Sept. 2014 LOTAR LOTAR International workshop on the 15 th – 17 th of Sept. 2014 LOTAR recommendations for consistency of 3 D PMI semantic information models in ISO standards Version 0 -1 © LOTAR 2010

16 – 18 Sept. 2014 LOTAR workshop Proposed LOTAR recommendations for standards for 3 16 – 18 Sept. 2014 LOTAR workshop Proposed LOTAR recommendations for standards for 3 D PMI semantic representation • In consistency with fundamental concepts LO po TAR sit ion of LOTAR NAS / EN 9300 part 3, : Recommendation that ISO STEP AP 242 information model for 3 D PMI “semantic representation” is the reference for the other related ISO standards initiatives • Recommendation to support coordination between the future ISO AP 242 edition 2 project and the other 3 D PMI standardization projects to define consistent international standard for 3 D PMI “semantic representation”, applicable for: ‒ The product life cycles: Simulation, Design, Manuf. , Inspection, Support ‒ The different business needs: exchange, query, LT archiving, visualization, … ‒ The different technologies: ASCII P 21, XML, binary, …

LOTAR recommendation to ISO /TC 184 /SC 4 for other ISO /TCs or Liaison LOTAR recommendation to ISO /TC 184 /SC 4 for other ISO /TCs or Liaison A associations Pr op to osa IS O l LOTAR recommendations via the LOTAR sponsoring associations acknowledged as official liaison with ISO /TC 184 /SC 4; e. g. : USA: PDES Inc, Europe: ASD , etc • The ISO /TC 184 /SC 4 proposes to • • • the ISO /TC 171/SC 2 (“Document Management Applications”) (respectively ISO /TC 261 “Additive Manufacturing”) (respectively DMSC “, A liaison member of ISO /TC 184) • to consider the use a common ISO information model for 3 D PMI “semantic representation” to provide necessary capabilities to all ISO standards data formats • The common ISO information model must be aligned to GD&T developments in ISO TC 10 (Technical product documentation) and ISO TC 213 (Dimensional & geometrical product specifications and verification) and equivalent ASME standards.

Presentation to the LOTAR project of the status of progress of STEP AP 239 Presentation to the LOTAR project of the status of progress of STEP AP 239 ED 3 whitepaper Slide 6 ASD SSG monthly confcal - 3 th of Nov. 2014

Table • Summary of LOTAR Sept. 2014 workshop • Proposed LOTAR recommendations for standards Table • Summary of LOTAR Sept. 2014 workshop • Proposed LOTAR recommendations for standards for 3 D PMI semantic representation • Presentation to the LOTAR project of the status of progress of STEP AP 239 ED 3 whitepaper • STEP AP 242 • Status / planning of CAx recommended practices for STEP AP 242 • Summary of STEP AP 242 ED 2 workshop (draft) • Preparation of AFNet – Pro. STEP i. Vi. P STEP AP 242 benchmark N° 1 Slide 7 ASD SSG monthly confcal - 3 th of Nov. 2014

Preparation of operational solutions for STEP AP 242 edition 1 standard Operational solutions for Preparation of operational solutions for STEP AP 242 edition 1 standard Operational solutions for the industry) Business needs / use cases STEP AP 242 E 1 Interop. Test Rounds (led by Manufacturers) STEP AP 242 E 1 standard STEP AP 242 E 1 Recommended Practices Benchmark STEP AP 242 E 1 Implementer Interop. Test Rounds Forum (by vendors) STEP AP 242 E 1 Pilots Slide 8 ASD SSG monthly confcal - 3 th of Nov. 2014

Status of STEP AP 242 Recommended Practices & associated activities of the Implementor Forums Status of STEP AP 242 Recommended Practices & associated activities of the Implementor Forums for Slide 9 DR AF cus T sio n dis ASD SSG monthly confcal - 3 th of Nov. 2014

International Kickoff confcal (2 nd of Sept. 2014) for the STEP AP 242 ED International Kickoff confcal (2 nd of Sept. 2014) for the STEP AP 242 ED 2 project Participants Standardization associations A&D Manufacturers NIST (A. Barnard Feeney) Embraer (E. Moura) Pro. STEP (M. Ungerer) Gulfstream (D. Ganser) PDES Inc (T. Bluhm, D. Edwards) Boeing (J. Ganguli, R. Zuray, T. Bluhm, Af. Net (J. Brangé, K. Le Tutour) D. Briggs) LOTAR (R. Zuray, JY Delaunay) Honeywell (J. Russel, C. Martinez) IAI (JP Stroweis) ISO / ASME experts L-Martin (J. Holmlund (K. Hunten, B. Fischer, T Thurman Airbus Gr. (F. Darré, S. Herail, JY Delaunay) N. Shaw, J. Haenisch, C. Caillet) Automotive Manufacturers A&D manufacturers associations PSA (F. Chambolle) AIA (R Rentsch) Scania (M. Hedlind) ASD SSG (Y Baudier) GIFAS (J. Brangé) Other industries EDF (C. Mouton) Automotive associations Galia (A. Loire) Slide 10 ASD SSG monthly confcal - 3 th of Nov. 2014

STEP AP 242 ED 2 project ISO and Project Views ISO View n n STEP AP 242 ED 2 project ISO and Project Views ISO View n n n Approved Work Item under TC 184 WG 12/WG 21 Application Protocol series; Communication and Ballot Project Leader Jean Brangé Project Editor Darla Nettles Edwards Countries providing experts: USA, China, France, Germany, Norway, Sweden Project View n Resources from Different Organizations/Companies – AFNET, ASD, AIA, GIFAS, Prostep i. Vi. P, PDES Inc. , NIST, Gulfstream, Embraer, Airbus Group, IAI – Euros, Dollars, Hours 11 n Joint projects working together LOTAR teams, PDES teams Slide 11 ASD SSG monthly confcal - 3 th of Nov. 2014

STEP AP 242 ED 2 project Steering Committee Allison Barnard Feeney – NIST Tom STEP AP 242 ED 2 project Steering Committee Allison Barnard Feeney – NIST Tom Bluhm – PDES, Inc. , Boeing Jean Brangé – AFNet Jeff Holmlund – Lockheed Martin Aeronautics Jean-Yves Delaunay – LOTAR International, Airbus Group Darla Nettles Edwards – NIST, Liberty Business Associates Dan Ganser – Gulfstream Alexander Loire – GALIA Howard Mason – Chair SC 4, BAE Systems Everson Moura – Embraer Jean-Pierre Stroweis – Israel Aeronautics Industries Max Ungerer – Prostep i. Vi. P Rick Zuray – LOTAR International, Boeing AP 242 Ed 2 Virtual Kickoff - September 2, 2014 12 Slide 12 ASD SSG monthly confcal - 3 th of Nov. 2014

STEP AP 242 ED 2 project Target Project Plan Overview High Level Milestones • STEP AP 242 ED 2 project Target Project Plan Overview High Level Milestones • New Work Item Approved July 18, 2015 • Kickoff - September 2 • CD Ballot Begins June 2015 • DIS Ballot Begins February 2016 • IS Submitted to ISO for Publicat. Nov. 2016 Slide 13 ASD SSG monthly confcal - 3 th of Nov. 2014

STEP AP 242 benchmark N° 1 Answers received from PLM vendors (30 th of STEP AP 242 benchmark N° 1 Answers received from PLM vendors (30 th of Sept. 2014) • Good results for the preparation of the organization of the 1 st STEP AP 242 benchmark • CAD-PDM vendors Ø Autodesk, Dassault Systemes, PTC, Siemens PLM solutions • CAD STEP interface integrators and STEP visualization Ø Coretechnologie, Datakit, Techsoft 3 D • PDM STEP interfaces integrators Ø EPM Jotne, Tsystems, Eurostep, Pro. STEP AG, Slide 14 ASD SSG monthly confcal - 3 th of Nov. 2014

Proposed use cases to be tested by the STEP AP 242 benchmark N° 1 Proposed use cases to be tested by the STEP AP 242 benchmark N° 1 (according to resources available) DR AF Slide 15 T ASD SSG monthly confcal - 3 th of Nov. 2014

Summary of the answers of the CAD vendors for the support of the STEP Summary of the answers of the CAD vendors for the support of the STEP AP 242 benchmark N° 1 DR AFT Slide 16 ASD SSG monthly confcal - 3 th of Nov. 2014

Summary of the answers of the PDM vendors/integrators for the support of the STEP Summary of the answers of the PDM vendors/integrators for the support of the STEP AP 242 benchmark N° 1 DR AFT Slide 17 ASD SSG monthly confcal - 3 th of Nov. 2014

Preparation of Afnet – Pro. STEP i. Vi. P STEP AP 242 benchmark • Preparation of Afnet – Pro. STEP i. Vi. P STEP AP 242 benchmark • Setting up of the technical team • Organization of a meeting on the 14 th of Oct. 2014 to finalize the agenda of the kick off conference call of the STEP AP 242 benchmark • Kick off confcal of the benchmark: 14 th of Nov. 2014 • Start of the benchmark N° 1 in April 2015 • Location of the software to be tested: Germany: Ø Pro. STEP i. Vi. P: Darmstadt, Ø Afnet: Paris, in relationship with the SIP project • Preparation of the benchmark from October 2014 to March 2015 Slide 18 ASD SSG monthly confcal - 3 th of Nov. 2014