0cba45ec89adde8eea72fc50fe1fea86.ppt
- Количество слайдов: 10
ABB Marine High Voltage Shore Connection © ABB Group 19 March 2018 | Slide 1
Driving forces for shore connection § Green profiling of cities and ship operators § Regulations like § § © ABB Group 19 March 2018 | Slide 2 MARPOL 73/78 Annex VI Limits on sulphur oxide and nitrogen oxide emissions from ship exhausts and prohibit deliberate emissions of ozone depleting substances EU Directive 2005/33/EG Limits the amount of sulphur to 0, 1% in all marine fuel used while at berth for more than 2 hours in European ports EU Recommendation 2006/339/EG The commission recommends its membership countries to promote shore side electricity facilities Cost of producing electricity on board
Infrastructure Considerations § § Continuous and temporary power demand § Cable management systems § On shore § On board § Location of ship berth § Location of shore connection point on board § Available space on board § Existing ship distribution network § © ABB Group 19 March 2018 | Slide 3 Voltage, frequency and grounding of the supplying network and ship network Safety management
ABB Marine Shore Connection Concept § § Shore Connection Box © ABB Group 19 March 2018 | Slide 4 Shore Connection Feeder The ABB High Voltage shore connection is an integrated system of both power and control equipment for seamless power transfer The ABB Shore connection concept will comply to the international standards, which are being developed § IEC 60092 -510 edition 1 IEC/ISO PAS
On board Installation Depending on the vessel’s design, ABB Marine Services is able to install and commission a complete shore connection system as a turnkey project during operation of the vessel with out interruptions of services © ABB Group 19 March 2018 | Slide 5
Shore Connection System Solutions Example § BLACK lines = control circuit § The power cable from the Shore. Connection Box is connected directly to the Main Switchboard Power transfer is seamless Synchronization and load transfer of the shore power will be controlled in the Engine Control Room and it is fully automatic RED lines = HV circuit § In this example the cable and cable reel are located on board the vessel § Light grey = ABB delivery for OPS § § § © ABB Group 19 March 2018 | Slide 6
Shore Connection Control and Supervision § § Synchronization and load transfer of the shore power will be controlled in the Engine Control Room and it is fully automatic § Interfacing to ship automation and onshore supply § © ABB Group 19 March 2018 | Slide 7 Power transfer is seamless Procedure can also be followed on shore side
ABB Shore Connection benefits § Turn key supply for the complete system § Safety through experience and system understanding § Reliability with type approved equipment § Availability of ABB worldwide service network § Environmental benefits through lower emissions § Better comfort due to reduced vibration and noise § Flexible arrangement and easy installation § Reduced lifecycle cost by reduced fuel consumption and maintenance cost © ABB Group 19 March 2018 | Slide 8
References Vessels with ABB High Voltage Shore connection system in use today § Cruise vessel 6, 6 k. V § Dawn Princess Cruise vessel 6, 6 k. V § Sea Princess Cruise vessel 6, 6 k. V § Ocean Princess Cruise vessel 6, 6 k. V § Golden Princess Cruise vessel 6, 6 k. V § Amsterdam Cruise vessel 11 k. V § Zuiderdam Cruise vessel 11 k. V § Westerdam Cruise vessel 11 k. V § Oosterdam Cruise vessel 11 k. V § © ABB Group 19 March 2018 | Slide 9 Sun Princess Noordam Cruise vessel 11 k. V
© ABB Group 19 March 2018 | Slide 10
0cba45ec89adde8eea72fc50fe1fea86.ppt