Скачать презентацию Site Report CNAF Sergio Andreozzi Valerio Скачать презентацию Site Report CNAF Sergio Andreozzi Valerio

ba98e39695d3965fea1ed03f708a38a4.ppt

  • Количество слайдов: 8

Site Report – CNAF Sergio Andreozzi + Valerio. Venturi JRA 1 IT/CZ Meeting Torino, Site Report – CNAF Sergio Andreozzi + Valerio. Venturi JRA 1 IT/CZ Meeting Torino, 5 Nov 2004

Site Report Sergio Andreozzi Site Report Sergio Andreozzi

Information Models • GLUE Schema V. 1. 2 – First draft published http: //infnforge. Information Models • GLUE Schema V. 1. 2 – First draft published http: //infnforge. cnaf. infn. it/docman/view. php/9/65/GLUEInfo. Model_V_1_2_draft_1. pdf – 13 Issues covered and documented in: http: //infnforge. cnaf. infn. it/tracker/? atid=118&group_id=9&func=browse – There is a fresh interest in restarting phone calls and defining a face-to-face meeting http: //agenda. cern. ch/ask. Archive. php? base=agenda&categ=a 044377&id=a 044377 s 0 t 13/transparencies – Possibly around the table INFN-Grid, Globus, EGEE, LCG, Grid 3 and UK e. Science

Information Models • All-Hands – Padova – Tue 16 Nov 2004 09: 00 ->10: Information Models • All-Hands – Padova – Tue 16 Nov 2004 09: 00 ->10: 30 Information System (chaired by Steve Fisher) • how and what information is published (hands-on), information for WMS, information for DM, service discovery – Wed 17 Nov 2004 09: 00 ->10: 30 DM & WMS interaction (chaired by Peter Kunszt) • Information System: Relationships of WM and DM services (15') In this talk all the information system parameters that are necessary to actually perform the interaction between the DM and WM systems are revisited and exposed - to be eyed very cautiously by the audience ANY ACTION BEFORE THESE TALKS? ? ?

Matchmaking with CE/NE/SE • Obtained Condor gang-matchmaking extension code • Plan to make some Matchmaking with CE/NE/SE • Obtained Condor gang-matchmaking extension code • Plan to make some test using the info about network connectivity as available in the INFN-Grid testbed – Currently 4 sites (Bari, Bologna/CNAF, Napoli, Padova), fullmesh • To be reported at Dec JRA 1 IT/CZ meeting

Site Report Valerio Site Report Valerio

VOMS Minor changes to EGEE cvs. VOMS on SL at CNAF. Support to VOMS VOMS Minor changes to EGEE cvs. VOMS on SL at CNAF. Support to VOMS on SL at NIKHEF (Oscar Koeroo) and Ui. B (Patrick Guio). (results in some fixes to error logging at startup, installation and startup scripts and installation docs. ) Fixes to Attribute Certificate encoding. (an error in encoding of validity fixed, some discussions are undergoing with JRA 3 on other minor changes) Bug fixed in voms-proxy-info (a bug in the retreival of AC from certificate in the chain was fixed)

New release plan agreed with Erwin Laure PM 7 port to SL running in New release plan agreed with Erwin Laure PM 7 port to SL running in 3 sites (CNAF, NIKHEF, Ui. B) DONE PM 8 AC format fixes and multy DN support PM 9 documentation egeefied PM 10 unit testing